Coyote Lakes Waterline Replacement Phase I

As the prime contractor, Auza Contracting replaced over 8,000’ of 8”, 6”, and 4” waterlines which service 160 homes in a large housing community in Surprise, AZ. The project included installation of 27 water valves, 2 fire hydrants, and 160 water service installations with over 2,000’ of water service lines from water main to meter. Detailed planning and scheduling were required to ensure minimal service disruption to residents while replacing the aging lines. Auza Contracting also removed and replaced over 3,900 SY of asphalt and seal coated over 27,000 SY of roadway during the project.