Owner: Toll Brothers
Construction Dates: Oct 2019 – Nov 2019
As a prime contractor to Toll Brothers, Auza Contracting installed over 30,000′ of electrical conduit, APS manholes, cabinet pads, and pull boxes required to complete an overhead to underground conversion of a APS 12KV power lines.