Owner: EPCOR
Construction Dates: Dec 2015 – Apr 2016
As the prime contractor, Auza Contracting installed over 1,800’ of 6” force main sewer line along a major arterial street to replace an aging existing sewer line in Sun City, AZ. The project included the installation of numerous sewer plug valves, manhole installation, and asphalt, as well as sidewalk, curb, and valley gutters.