07 Aug QTS Data Center
Who: Cannon & Wendt | DPR When: Mar 2022 - Jan 2024 Installation of 20,630 feet of medium voltage duct bank and 18 electrical manholes. Installed 8200 feet of telecommunication duct bank and 19 telecommunication manholes....
Who: Cannon & Wendt | DPR When: Mar 2022 - Jan 2024 Installation of 20,630 feet of medium voltage duct bank and 18 electrical manholes. Installed 8200 feet of telecommunication duct bank and 19 telecommunication manholes....
Who: Nukote | Gila River Indian Community When: Jan 2024 - Mar 2024 Sprayed protective liner inside 1200 feet of 48-inch concrete pipe and three 12' x 30' x 14' manholes....
Various Jobs...
Who: EPCOR When: Ongoing Water valve replacement Maintaining and replacing fire hydrants Water service replacements Manhole adjustments Upgrading PRVs, installing meter by-passes Improvements on the wastewater treatment plant, sewage repairs and cleaning, and replacing meter boxes ...
Owner: Town of Wickenburg Construction Dates: Aug 2015 – Nov 2015 As a subcontractor to Grey Mountain Construction, Auza Contracting installed over 2,200’ of 8” waterlines, 1,800’ of 8” and 2” sewer lines, 750’ of 42” and 24” storm drain pipe, as well as numerous 3 relief...
Owner: EPCOR Construction Dates: Dec 2015 – Apr 2016 As the prime contractor, Auza Contracting installed over 1,800’ of 6” force main sewer line along a major arterial street to replace an aging existing sewer line in Sun City, AZ. The project included the installation of numerous...
Owner: Arizona Department of Transportation (ADOT) Construction Dates: Apr 2016 – Jul 2016 As a subcontractor to Coffman Specialties, Auza Contracting realigned over 1400’ of 12”, 10”, and 8” water and sewer lines, installed 3 sanitary sewer manholes, relocated 6 fire hydrants, and relocated 16 water services...