Archive

Owner: EPCOR Construction Dates: Jun 2015 – Jan 2016   As a prime contractor, Auza Contracting installed over 10,000’ of 16” water main along a major arterial road in Surprise, AZ to provide water services for a new housing development. The work included 2 vertical realignments, jack and...

Owner: Town of Wickenburg Construction Dates: Aug 2015 – Nov 2015   As a subcontractor to Grey Mountain Construction, Auza Contracting installed over 2,200’ of 8” waterlines, 1,800’ of 8” and 2” sewer lines, 750’ of 42” and 24” storm drain pipe, as well as numerous 3 relief...

Owner: EPCOR Construction Dates: Dec 2015 – Oct 2019   As the prime contractor, Auza Contracting replaced over 20,000’ of 8”, 6”, and 4” waterlines, which service over 350 homes in a large housing community in Surprise, AZ. The project included installation of 45 water valves, 7 fire...

Owner: City of Phoenix Construction Dates: Jan 2016 – Jul 2016   As a subcontractor to Kiewit Infrastructure West, Auza Contracting trenched, fused, and installed over 3,200’ of 24” HDPE pipe between the Union Hills Water Treatment Plant and the Cave Creek Water Reclamation Plant....

Owner: City of Phoenix Construction Dates: Jun 2014 – Jun 2016   As a subcontractor to Kiewit Infrastructure West, Auza Contracting performed 19 waterline vertical realignments (6” – 24”), 42 fire hydrant relocations, 86 water service and backflow preventer relocations, 52 water valve relocations, 2 fire department connection...

Owner: EPCOR Construction Dates: Nov 2016 – Feb 2017   As a prime contractor, Auza Contracting installed over 15,000’ of 6” to 16” waterlines for a new water transmission main to accommodate property development along Perryville Road in Surprise. The work included installation of multiple fire hydrants, air...

Contracting Investor: Newland Communities Construction Dates: May 2018 – Mar 2019   As a prime contractor, Auza Contracting installed the backbone wet utility infrastructure for a community development that will deliver over 1,200 new housing units. The work includes installation of over 22,000’ of potable and non-potable waterlines...

Contracting Investor: EPCOR Construction Dates: Sep 2017 – Nov 2017   As the Construction Manager at Risk, Auza Contracting installed over 2.4 miles of 12” waterline to provide EPCOR water to Luke AFB’s water distribution system. This project was completed in 12 weeks. The work included installation of...

Owner: Toll Brothers Construction Dates: Jan 2019 – Jan 2020   As a prime contractor, Auza Contracting installed over 8,000’ of 30” waterline to allow construction of a golf course serving a new community that will deliver over 2,000 new homes. The work included cathodic protection installation and...